Customization: | Available |
---|---|
After-sales Service: | 12 Months |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Automatic PE LDPE HDPE LLDPE PVC PET EVA PS ABS high speed plastic pulverizer mill machine
Application
Adopted material is HDPE LDPE LLDPE PVC PE PET pellet or flakes that the size is not surpass the 12mm ,soft PVC ,HARD pvc and so on.
Final powder mesh size in genneral is between 20~80 mesh.
The powder mesh size is adjustbale.
Specification
Disc-type
|
||||
Item Model
|
MF-400
|
MF-500
|
MF-600
|
MF-800
|
Main Motor(KW/hp)
|
22/30
|
37/50
|
45/60
|
45/100
|
Total Power(KW/hp)
|
26/35
|
44/59
|
54/72
|
88/118
|
Blade Material
|
SKD-11
|
SKD-11
|
SKD-11
|
SKD-11
|
Capacity
|
50-300kg/hr
|
80-500kg/hr
|
120-800kg/hr
|
200-1200kg/hr
|
Vibration Sieve
|
ZDS-800
|
ZDS-1000
|
ZDS-1000
|
ZDS-1200
|
Dimensions(mm)
|
2600x2200x3600
|
3000x2800x3900
|
3200x3000x4200
|
3500x3200x4500
|
Weight(kg)
|
1680
|
2280
|
2680
|
3580
|
Turbo-type
|
||||
Item Model
|
SMW-400
|
SMW-500
|
SMF-600
|
SMF-800
|
Main Motor(KW/hp)
|
30/40
|
37/50
|
45/60
|
75/100
|
Total Power(KW/hp)
|
30/40
|
44/59
|
54/72
|
88/118
|
Vibration Sieve
|
No
|
ZDS-1000
|
ZDS-1000
|
ZDS-1200
|
Capacity(kg/h)
|
50-120
|
80-280
|
120-380
|
200-800
|
Dimensions(mm)
|
2200x1500x1600
|
3000x2800x3900
|
3200x3000x4200
|
3500x3200x4500
|
Weight(kg)
|
1000
|
1680
|
2280
|
2880
|
Application Material
Q: How about your after-sale service ?
We offer manual instruction and engineer training before loading,after shipment we provide 24 HRS online support, video technical support or field installation assist.
Q: What is the lead time?
For customized machine, it takes about 45-60 days after deposit. For stock machine, fast shipment. ( The actual production cycle will vary according to the degree of customization.)